The Story So Far > Design & development…
Please use the timeline to find out more about each stage of the project.
-
- Mar 2010
-
-
> 18.02.2010 –
Edinburgh Tram Network Statement of Case for TROs
Please click on the attached pdf to view the full Statement of Case for Traffic Regulation Orders.> click here to open -
> 16.02.2010 –
Edinburgh Tram TRO Drawings
The first Traffic Regulation Order (TRO1) went to statutory consultation in October 2009 and comments were sought from...> click here to open -
> 15.02.2010 –
Edinburgh Tram TRO leaflet
Please click on the attached pdf to view the TRO leaflet. This explains the Traffic Regulation Orders process, provides...> click here to open -
> 14.02.2010 –
Edinburgh Tram TRO Stationary Schedules
The Schedules set out the on-street traffic regulations which are referred to in the TRO drawings.> click here to open -
> 13.02.2010 –
Edinburgh Tram TRO Moving Traffic Schedules
The Schedules set out the moving traffic on-street regulations which are referred to in the TRO drawings.> click here to open
-
> 18.02.2010 –
- Jan 2010
-
-
> 01.01.2010 –
Edinburgh Tram Network: Traffic Modelling Report January 2010
Please click on the attached pdf to view the full report on traffic modelling for the Edinburgh Tram Network.> click here to open
-
> 01.01.2010 –
- Jul 2009
-
-
> 01.07.2009 –
Edinburgh Tram Cycle Integration Study
In November 2008, TPi completed a Scoping Study to determine the requirements for more detailed work to ensure that the...> click here to open -
> 01.07.2009 –
Appendices for Edinburgh Tram Cycle Integration Study
These are the appendices for the Edinburgh Tram Cycle Integration Study (available> click here to open - Apr 2009
-
-
> 27.04.2009 –
Disability Consultation Report
> click here to open
This report details items raised during consultation on the Edinburgh Tram mock-up on the 4th, 5th and 11th...
-
> 27.04.2009 –
- Mar 2009
-
-
> 30.03.2009 –
Tram Route Final Design
> click here to open
As part of the final detailed design process, over 130,000 people from local communities were invited to...
-
> 30.03.2009 –
- Sep 2008
-
- > 24.09.2008 –
- Oct 2007
-
-
> 08.10.2007 –
A first glimpse
> click here to open
As design evolved and procurement progressed, a much clearer idea of the look and feel of Edinburgh''s new tram...
-
> 08.10.2007 –
- Jul 2007
-
-
> 26.07.2007 –
Safety Policy Statement
tie recognises that the control of health and safety aspects arising from the> click here to open
Edinburgh Tram...
-
> 26.07.2007 –
- Mar 2007
-
-
> 27.02.2007 –
Environmental Policy Statement
tie recognises that the achievement of excellence in the delivery of transport projects is underpinned by...> click here to open -
> 27.02.2007 –
Quality Policy Statement
The project will adopt a quality management system which conforms to the principles and requirements of BS EN ISO...> click here to open
-
> 27.02.2007 –
- Sep 2006
-
-
> 01.09.2006 –
Tram Details
> click here to openThis document contains details on the various stages of the Tram Project's development, starting with "Why...
-
> 01.09.2006 –
-
> 01.07.2009 –